Concrete Finisher's needed at Cliff Drive May 2-CANCELLED
« on: April 17, 2009, 02:05:56 PM »
Saturday, May 2.  We will be pouring the concrete.  I need to have those people that know how to properly finish ready to go.  The big truck will come in, fill the form, then we go at it.  The more teams we have in place, the faster, and quicker it will be.  Please pass this information along.  Contact me directly at 913.485.5123 for more information about helping.
« Last Edit: April 30, 2009, 11:40:44 AM by jack »
===o  {>[]----
Jack Lowe-
Parks Development Director for KCFDC
Multiple PDGA Worlds TD
Course Designs
913.485.5123-C
"Disc Golf-
Like ball golf, only faster,
cheaper, and healthier!"

Dan Weinert

  • 1000 Rated Poster
  • ***
  • Posts: 1722
  • PARADISE ROCS!!!
    • View Profile
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #1 on: April 17, 2009, 03:52:04 PM »
WOW...great news!!!

Too freakn' bad I will be at my son's College Graduation that day.

Oh well...sh!t happens that way sometimes!!!

Dan  8) ::) 8)
« Last Edit: April 17, 2009, 03:55:38 PM by Lefty2 »
For a good time: Lat- 3925'8.92"N, Long- 9433'18.52"W

Keizer

  • Guest
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #2 on: April 17, 2009, 03:57:40 PM »
Dan, we will give it hell for ya. Congrats to your boy on his college graduation!

jack

  • Moderator
  • 1000 Rated Poster
  • *****
  • Posts: 7194
    • View Profile
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #3 on: April 17, 2009, 03:59:28 PM »
that took longer than Disc Golf pads at Cliff Drive, you are officially "excused"
===o  {>[]----
Jack Lowe-
Parks Development Director for KCFDC
Multiple PDGA Worlds TD
Course Designs
913.485.5123-C
"Disc Golf-
Like ball golf, only faster,
cheaper, and healthier!"

Dan Weinert

  • 1000 Rated Poster
  • ***
  • Posts: 1722
  • PARADISE ROCS!!!
    • View Profile
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #4 on: April 17, 2009, 04:07:01 PM »
In lew of my slackass excuse for not being there, I will however make sure everything is "pour ready".

Deal gentlemen?

Dan   8) ::) 8)
« Last Edit: April 17, 2009, 08:14:50 PM by Lefty2 »
For a good time: Lat- 3925'8.92"N, Long- 9433'18.52"W

Dan Weinert

  • 1000 Rated Poster
  • ***
  • Posts: 1722
  • PARADISE ROCS!!!
    • View Profile
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #5 on: April 19, 2009, 08:56:48 PM »
Jack and Mike,

Do you guys have the 2 new pad locations marked?

Is that the new flags on #13? Where does new #16 go?

I will get those moved and everything pour ready this week.

Please advise!!

Dan   8)  816-506-2267
For a good time: Lat- 3925'8.92"N, Long- 9433'18.52"W

Dan Weinert

  • 1000 Rated Poster
  • ***
  • Posts: 1722
  • PARADISE ROCS!!!
    • View Profile
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #6 on: April 20, 2009, 02:08:44 PM »
Jack and Mike,

Need info so I get this done gentlemen...you too Mike!

Dan  8)
For a good time: Lat- 3925'8.92"N, Long- 9433'18.52"W

jack

  • Moderator
  • 1000 Rated Poster
  • *****
  • Posts: 7194
    • View Profile
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #7 on: April 20, 2009, 02:53:54 PM »
I have not yet determined the pads for 13 & 16, nor the pins on 13 & 16 that will be going in.  I'll take some paint with me tonight and light it up with where they go.  Realizing that Mr. Keizer is back to building cars today...I am uncertain how much time he will be able to give to the project.
===o  {>[]----
Jack Lowe-
Parks Development Director for KCFDC
Multiple PDGA Worlds TD
Course Designs
913.485.5123-C
"Disc Golf-
Like ball golf, only faster,
cheaper, and healthier!"

Dan Weinert

  • 1000 Rated Poster
  • ***
  • Posts: 1722
  • PARADISE ROCS!!!
    • View Profile
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #8 on: April 20, 2009, 03:09:41 PM »
I'll get it done sir...just let me know the details.

Dan  8)
For a good time: Lat- 3925'8.92"N, Long- 9433'18.52"W

jack

  • Moderator
  • 1000 Rated Poster
  • *****
  • Posts: 7194
    • View Profile
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #9 on: April 20, 2009, 03:28:20 PM »
I also want to make sure that the P&R is coming in for sure.....I got the person that does the work to say no problem, now I want to make sure that I get the director to again start up the machine.  He was already a yes earlier, so hopefully this will help.  Please do me a favor all of you and let everyone know at the leagues the next few weeks that we have a work day planned for May 2 at Cliff Drive, and primarily we will be working on the tee pads.

Thanks,

Jack
===o  {>[]----
Jack Lowe-
Parks Development Director for KCFDC
Multiple PDGA Worlds TD
Course Designs
913.485.5123-C
"Disc Golf-
Like ball golf, only faster,
cheaper, and healthier!"

Keizer

  • Guest
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #10 on: April 20, 2009, 04:42:11 PM »
I have not yet determined the pads for 13 & 16, nor the pins on 13 & 16 that will be going in.  I'll take some paint with me tonight and light it up with where they go.  Realizing that Mr. Keizer is back to building cars today...I am uncertain how much time he will be able to give to the project.

As of now, I still have weekends and after a week or two I should have weekday evenings as well.

Dude, #13's pad definitely needs to go near the flags, that's an awesome shot with the road there, but let's raise the canopy on that nearby tree a bit and slide the pad under the north side of it for some shade. 8)


jack

  • Moderator
  • 1000 Rated Poster
  • *****
  • Posts: 7194
    • View Profile
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #11 on: April 21, 2009, 09:48:28 AM »
its a mulberry tree......Corbett can't eat them all....
===o  {>[]----
Jack Lowe-
Parks Development Director for KCFDC
Multiple PDGA Worlds TD
Course Designs
913.485.5123-C
"Disc Golf-
Like ball golf, only faster,
cheaper, and healthier!"

Keizer

  • Guest
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #12 on: April 21, 2009, 05:05:22 PM »
Well, I guess we don't need purple splatter all over the pad. Still be nice to incorporate into the tee area though.

ptinkc

  • Am Poster
  • *
  • Posts: 118
    • View Profile
    • http://end-of-the-web.com
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #13 on: April 26, 2009, 09:49:36 AM »
Jack just a side note, the forms your using are fine for concrete at ground level and at 3.5 inches tall they should hold about 1 and 1/8 yards of concrete roughly. Some of the forms are to tall and wont handle the weight of the concrete when filled. They can be off the ground a max of 1-2 inches before you have to really stabilize the forms with better supports than you are using presently. If you back fill the form with gravel this will help also. When pouring from the truck the concrete coming out of the truck should not hit the side of the form either as it can knock the form out of square or completely over.
Three discs' in the hand is better than twenty in the bag!

Psychoholic

  • Pro Poster
  • **
  • Posts: 346
  • Beer snob
    • View Profile
Re: Concrete Finisher's needed at Cliff Drive May 2
« Reply #14 on: April 26, 2009, 08:35:44 PM »
When pouring from the truck the concrete coming out of the truck should not hit the side of the form either as it can knock the form out of square or completely over.

That would suck.. :'(