Yesterday Bob, Max and I (mostly Bob and Max) located the exit for the basin drain in Terrapin Station, opened it up and cleaned out the four inches of @#$% on the floor. If the the drain exit has to be located in the future, it's 154" to the left (facing the building) of the left column, lined up with the center of the column, and 31" deep. Need to work out a drainage plan to keep the eroded dirt from washing into the Station. Anytime you see the basin overflowing, please clear the drain.
Today Max (maybe Bob & Jamie) and I plan to install a new placement on #7; it will be to the right of the existing short placement, in the shadow of the big cottonwood. Because of the erosion problems it creates, the existing short placement will be removed or disabled.[/b]