Author Topic: Cliff Drive Wide Open Preparedness ready work weekend-June 3  (Read 1403 times)

0 Members and 1 Guest are viewing this topic.

jack

  • Moderator
  • 1000 Rated Poster
  • *****
  • Posts: 7316
    • View Profile
Cliff Drive Wide Open Preparedness ready work weekend-June 3
« on: April 18, 2006, 08:48:44 PM »
Folks,

I need your help getting the course ready for the Wide Open. I have many
projects that will need to be tackled this upcoming weekend, that we can get
started on. I need to have people to help advise others, people that konw how
to drive machinary (we have access to a few machines all weekend, so even if you
can not make it on Saturday, Friday or Sunday would be great as well.)

Please come out and help this weekend, we can truly make a difference on the
course this weekend, we are fast approaching the phase to get tee-pads
installed, and this weekend could go a long way towards getting us to that point.

Let me know how you to can be a part of the vision.

Thanks,

Jack
--
===o {>[]----

Jack Lowe
President-KCFDC
http://www.KCFDC.org
816.231.3622-H
913.485.5123-C
"Disc Golf-
Like ball golf, only faster,
cheaper, and healthier!"


-------------- Forwarded Message: --------------
From: George Biswell
Subject: Great Am. Clean up 4/22/06
Date: Mon, 17 Apr 2006 16:31:58 +0000


Lou I had meeting with Mike Spady this morning. We will need to provide the
following for the clean up

1. Two flat bed truck 2ton
2. Chipper truck
3. 910 loader
3. unloader
4. truck load of dirt for the KCFDC area.
5. picnic tables, and grill
6. Packer trash truck
7. tow truck ( I will order from fleet maintenance)
The area that you will be working on is the overlook areas along Cliff Drive the
staging area will be at Lexington Ave and Prospect Blvd. same as last year. I
will order the 2 port-potties units and hand washing until and have them station
at the staging area. .
The work will get started at 8: 00 a.m. I will need to pick up about 20 safety
cones on Friday the 21st. so that Mike Spady can use for Sat clean. He will also
have use of my hand held city Radio For Sat. If any thing else come up or you
have any question get let me know. Thanks for all your help.


George E.Biswell
Landscape Inspector
North Region
office 513-7524
===o  {>[]----
Jack Lowe-
Parks Development Director for KCFDC
Multiple PDGA Worlds TD
Course Designs
913.485.5123-C
"Disc Golf-
Like ball golf, only faster,
cheaper, and healthier!"

Mike Penney

  • Pro Poster
  • **
  • Posts: 546
    • View Profile
    • myspace
Cliff Drive Wide Open Preparedness ready work weekend-June 3
« Reply #1 on: April 20, 2006, 08:42:16 AM »
We need as many people as possible to come out for this. Please if you have the time, come out. This course is not only good for disc golf but the neighborhood as well. Jack, House, Jamie, myself and many others have worked dilligently over the past 3 years to make this a world class course. We need you.  Please get involved!!!!!!!!!! Even if it's only for a hour or two.
Mike Penney

jack

  • Moderator
  • 1000 Rated Poster
  • *****
  • Posts: 7316
    • View Profile
Cliff Drive Wide Open Preparedness ready work weekend-June 3
« Reply #2 on: April 21, 2006, 05:48:49 PM »
Folks here goes.  We need people to help with the following:
-Removal of honeysuckle trees, either through cutting yourself, or help pulling out, or directing a group to get this accomplished.
-organization of the teams of kids to ensure that they are picking up the trash in the right spots, and you are able to help them identify areas that will need attention
-operate the "mini bulldozer" or the "trac-hoe", I dunno if that is what these things are called, I obviously then don't know how to operate one, but give me a few beers and a set of keys, and....well maybe I'll still watch and ask someone else to move the earth for us
-use your mower to continue to get the area that we have been cutting back of honeysuckle to entice the current mowing crew to continue with our efforts
-holes that we want work on will be as follows, what of this we accomplish will be great.
Hole #1 (old #6-will not refer to the old holes in ths mail any longer so follow closely)
remove the honeysuckle around the left of current pad.  remove all downed debris from February clean up.  remove all garbage and debris in lower section.  work on clearing out for new pad placement in lower level.  remove honeysuckle wall to West of basket and clear out all honeysuckle as possible.  Remove pile of debris from center of fairway.  mow "green" area.  remove hanging vines.  trim tree way West for alternate placements

Hole #2
clear out all downed debris towards the end of the new fairway.  cut all ankle busters, old and new ones.  remove honesuckle on the hill to West.

between holes-clear and remove all ankle busting honeysuckle targets.

Hole #3
clear out all ankle busters and remove all cut trees.  remove debris and cut trees.  create stair case out from green.  clear out honeysuckle on rock.  continue to clear out to the North of honeysuckle.

hole #4
place giant boulders to prevent people from parking and "drive-thru" area around the trash can.  hit gulley and remove "itch vines".  clear out trash.  get partial trees down and out.  clear honeysuckle to North of stairs out up to wall

hole #5
clear out old area of "new growth", this would be to the North of the existing pin.  Clear out the growth to the South of the pin that used to protect the old pad for the next hole, thus creating opportunities to utilize for the next green.

hole #6 clear out the area just West after the first clearing or downed tree bench from old pad.  remove all downed debris over years of our removal

hole #7
With the help of P&R start to creat the new pad area across the road.  Clear out the current green and remove the ankle busters.  continue to work around the road to open and expose the rock facing.  create trails, more defined.  plant wild flowers and ground covering to replace soil growth between #7 green and #8 pad.  remove all trees that are around the area.  replace rocks to deter travel on old road.

Hole #8
reomve all honey suckle, off pad, clear out the new growth, to the East of fairway, clear out as much honeysuckle as possible and downed trees.  to the West of the fairway, continue to clear out on the hill up towards #10 current pin.  remove all the piles of downed trees.  place the trash cans at proper locations.  remove trash.  remove tires.

hole #9
continue to Brandt proof the view to the lake.  work on the left side of fairway at removal of honeysuckle.  remove trash.  work on the new placement to left of current on the next level.

hole #10
work on the new deeper placement.  clear out honeysuckle on this area, being careful to protect the next #1 pad in the "bowl".  Develop a crossing to get over to the soon to become "staging area" for party activities across the valley.  Will need to go to the NE Athletic Field to grab the big ties to use on this, will require big equpiment to work.  This also means creating a new trail to exit from the new deep placement.

Hole #11
Clear out the trees along the reservoir gate.  Cut Poison Ivy off of trees to East of current pin.

Hole #12
Well clean trash somehow to the North of the fairway.  Remove honeysuckle.  remove trash.  remove trash to the north, then remove the trash from the north.  Possibly create a new pin on the hill for an even tougher risk/reward shot on an already hard pin placement.

Hole #13
Clear out the trees growing through the bushes.  Remove Poison Ivy on the big tree.  Plant a tree line to replace the dying and dead trees on the North side of the fairway.

Hole #14
Remove trees growing through the bushes.  Remove the Dead Tree attached to the other tree, and remove the poison ivy.

Hole #15
Remove the IVY on the trees.

Hole #16
Clear out the Trees to expose the metal work on the reservoir.

Hole #17
Check trees for ivy and trimming.

Hole #18
relax, this hole is pretty good!

In summary the top items that I would like to see us accomplish this weekend are these:
Remove the honeysuckle from all around hole #1 and clear it out in the bowl.  Then tie that to cleaning out the new #10 pin and trail.  Staying along those lines clearing the hillside between #10 and #8 to clean the sightlines.  THen following that down to the road to where the new pad for #7 will be.  We will also want to work on the holes for #2 & #3 at reemoval and clearing.  

If we can tackle most of that, working on the new pin for #9 will be the added bonus.

I am in obvious need of some major help.  We want to tackle as much of the big items this weekend as we can, but those that do not get done, we will need to tackle prior to the Wide Open.

I need your help, and then helping the direction for all 120+ volunteers.  Your time can be greatly appreciated this weekend, earn some extra brownie points with me, the course, mother nature and your own karma gods and deamons that you must expell....

Your all great, help me think even more of you, and help those in the community that have disc golf know how much you appreciate them allowing us to be there to help make this park a better place for all.

Thanks,

Jack


Jack Lowe
President KCFDC
http://www.kcfdc.org
"Future Home of Cliff Drive Baskets!?!"
816.231.3622-H
913.485.5123-C
===o  {>[]----
Jack Lowe-
Parks Development Director for KCFDC
Multiple PDGA Worlds TD
Course Designs
913.485.5123-C
"Disc Golf-
Like ball golf, only faster,
cheaper, and healthier!"

jack

  • Moderator
  • 1000 Rated Poster
  • *****
  • Posts: 7316
    • View Profile
Cliff Drive Wide Open Preparedness ready work weekend-June 3
« Reply #3 on: April 23, 2006, 09:07:10 PM »
I just wanted to thank all of those that bothered to show up on Saturday, and some Sunday to get some more work done on the course.

Terry Adams really went to town on the new hole #1, getting the backhoe around there and clearing out many big stumps and moving the piles around #8.  Also thanks for coming out some on Sunday and clearing out more.

Dan was able to get some work started, but unfortunately the trac hoe failed to finish the job, work remains on hole #3 and #4 for sure.

THe following others came out as well
Mike Penney-(That meant that every Course Coordinator from MO made it to the clean up)  Also thanks for a lot of the prelim work.
Mike Spady-Organizer of the event, we cleaned up over 30,000 lbs of trash, and had close to 100 people come to help.
Kristi
Beckett
John Theiss
John Buckle ( and son also came out Sunday)
Doug
Jeff Campbell
Nick Arbeitman
Linda Arbeitman
Demian Vela
Tracy Abeln
Michael Herron


More work to do, but your help really made a difference.  This course is really starting to come along nicely, the new additions will only add to the course, and the development.

THanks,

Jack
===o  {>[]----
Jack Lowe-
Parks Development Director for KCFDC
Multiple PDGA Worlds TD
Course Designs
913.485.5123-C
"Disc Golf-
Like ball golf, only faster,
cheaper, and healthier!"

jack

  • Moderator
  • 1000 Rated Poster
  • *****
  • Posts: 7316
    • View Profile
Workday this week
« Reply #4 on: May 31, 2006, 11:07:20 PM »
I plan on being back and working on the course this Thu afternoon-Friday until I get Marley, and Saturday.

Basically this is what needs to get done-
holes #1-8
MOW the grass around the areas and clear out the new growth, weed whackers and mowers should work.

Sink the concrete bricks to be flat with the ground on all pads.

Create bigger, flatter teeing areas for holes #10, #11, #14, #18

Paint the baskets ORANGE for visibility

Plant new pin on #5-F'ing Arturo, will take care of your acehole! :)

Ensure OB is painted correctly, and course is marked for ease of following configuration.

Get Trash cans out to the right holes

Get Practice basket in new area by #1 to the north of the pad closer to the old tee area

That should be about it.  I moved all the baskets last week to reflect
===o  {>[]----
Jack Lowe-
Parks Development Director for KCFDC
Multiple PDGA Worlds TD
Course Designs
913.485.5123-C
"Disc Golf-
Like ball golf, only faster,
cheaper, and healthier!"

Mike Penney

  • Pro Poster
  • **
  • Posts: 546
    • View Profile
    • myspace
Cliff Drive Wide Open Preparedness ready work weekend-June 3
« Reply #5 on: June 01, 2006, 05:24:57 AM »
OB line have been painted.......there is a line all the way around the course, should be fairly diffacult to get confused.....same goes for Blue Valley and Water Works. Rosedale and Swope still needs to be done.
Mike Penney